Stainless Steel Sterilizing Bottle Conveyor Systems
This equipment is composed of frame, top gate, chain mesh belt, reducer, drive system, steam heating system, plate and centrifugal pump etc.
Application Fields:
This type sterilizing and cooling tunnel is widely used to sterilize and cool down bottle, can type acidic dairy milk, fruit juicebeverage, electrolyte beverage, wine and seasoning product etc.
Working Principle:
Transportation belt conveying those full packaged and sealed beverage into the sterilization section, then to be sterilized by high temperature hot water spraying, use warm water to pre-cooling product, and use low temperature water cool down product temperature, finally use top stainless steel nozzle spraying soft water to clean all product
Equipment characteristics:
Continuous spraying sterilization cooling tunnel adopts circulating warm water preheating, circulating hot water sterilization, circulating warm water precooling, and then cooling water spray cooling, four-stage processing form; it has the advantages of automatic control of sterilization temperature and stepless adjustment of sterilization time
PLS-3000 | PLS-6000 | PLS-8000 | PLS-12000 | PLS-18000 | |
Maximum sterilize temperature | 100℃ | ||||
Line speed of the conveyer | 110-553mm/min | ||||
Heating steam pressure | 0.4MPa | ||||
Heating water consumption(m3) | 21 | 40 | 55 | 80 | 120 |
Total power(kw) | 9.6 | 10.6 | 13.6 | 16.5 | 25 |
External dimension(mm) | 6500 | 14000 | 18880 | 21880 | 31000 |
2250 | 2750 | ||||
1735 | 1735 | ||||
GW(kg) | 3000 | 5000 | 6500 | 8500 | 12000 |
Tunnel area(m2) | 13.5 | 26.5 | 34 | 51 | 76 |
Q1: Are you a trading company or a manufacturer?
A1: We have our own factory for many years, can give u best service.
Q2: What's your guarantee if we buy your machines?
A2: We offer you high-quality machines with a 1-year guarantee and free spare parts for 1 year. Meanwhile, our engineers have rich experience and have gone to more than 50 countries for installation and commissioning.
Q3: When can I get my machine after I paid?
A3: We will deliver the machines on time as the date we agreed on both sides.
Q4: How can I install my machine when it arrives?
A4: Our engineer will go to your side as soon as you get your machines ready for testing and teaching your technicians how to run the machines.
Q5: What's the delivery time?
A5: 30-45 days after the T/T deposit or L/C.
Q6: Do you provide customized service?
A6: We can design the machines according to your requirements (material, power, filling type, container and etc), at the same time we will give you professional suggestion by many years industrial experience.