this series use for 0.3-2L Small container, like water, juice,oil,carbonated drink and etc
The main role of air compressor in the bottle blowing industry, air compressor is the main body of the bottle blowing machine air source device, it is the prime mover (usually a motor) mechanical energy into gas pressure energy device, is compressed air after the bottle blowing machine special air pressure generating device.
Equipment Model | Free Air Delivery M3/min | Pressure Mpa | Power Kw | Rotating speed r/min | Compressing stage | Dimension Mm | Weight Kg |
PET-2.0/30 | 2.0 | 3.0 | 22 | 600 | 2 | 1150×860×1600 | 610 |
Air tank
| Pressure: 3.0Mpa | Capacity:0.6 M3 | Dia:800 High:1800 | ||||
Oil-Water separator | 2.0 | 3.0 | Granule dia.:≤5 um | All equipments will be fit into one plate including pipes and valves | |||
Air dryer | 2.0 | 3.0 | dew point:-23℃ | ||||
Pre-filter | 2.0 | 3.0 | Oil ≤5mg/ m3 Granule dia. ≤3um | ||||
Extractive filter | 2.0 | 3.0 | Oil ≤0.1mg/ m3 Granule dia. ≤0.3um | ||||
Carbon filter | 2.0 | 3.0 | Special to delete smell | ||||
Super extractive filter | 2.0 | 3.0 | Oil ≤0.1mg/ m3 Granule dia. ≤0.01um | ||||
Control panel for whole air system |
1. Low rotation speed and short charging time.
2. Belt drive.
3, unique lubrication device, simple and reliable structure, good lubrication effect.
4, piston ring and other consumable parts of long life low failure rate, good economy.
5, low energy consumption, low vibration, low noise, professional for hydropower special high-performance air compressor.
Our Services:
1 year quality warranty and supply spare parts at low cost for life span after sale. We keep the original
drawings of spare parts, so it can match with the rest part of machine.
2. 24 hours/365 days online technical service.
3. Training offered
Q1: Are you a trading company or a manufacturer?
A1: We have our own factory for many years,can give u best service.
Q2: What's your guarantee if we buy your machines?
A2: We offer you high quality machines with 1 year guarantee and free spare parts for 1 year. Meanwhile our engineers have rich experience and have gone to more than 50 countries for installation and commissioning.
Q3: When can I get my machine after I paid?
A3: We will deliver the machines on time as the date we agreed both side.
Q4: How can I install my machine when it arrives?
A4: Our engineer will go to your side as soon as you get your machines ready for testing and teaching your technicians how to run the machines.
Q5: What's the delivery time?
A5: 30-45 days after the T/T deposit or L/C.
Q6: Do you provide customized service?
A6: We can design the machines according to your requirements (material, power, filling type, container and etc), at the same time we will give you professional suggestion by many years industrial experience.