Shrink wrappers are mainly used in beer, beverage, food, non-food industry such as glass and plastic bottle and box industry packing. Design aims at different model. Single lane shrink wrapper can pack 10-45cartons per minute.
Half Tray Shrink PE Film Wrapping Machine
Beverage bottle from the bottle conveying with input and shunt in the bottle into a plurality of rows of travel, through the door opening and closing mechanism will bottle group, catch the bottle rod will be a good group of bottle to wrap film belt, and film feeding servo began to send film, film feeding after the completion of the hob film cutting, by around the membrane device will film according to the certain way around the bottle. Then the bottle into the oven, shrink packaging material softening after heating, and close to the bottle, the bottle will complete the cooling fan group wrapped, so the packaging process
Technical Parameters
Power supply / Total power: 380/220V, 75KW (three-phase)
External gas source: 4-6kgf/cm2
Main motor: 380V 3300W
Bottle separate electricity motor: 380V 820W*2
Exit belt motor : 380V 750W
Film cutting electricity motor: 380V 820W
Film feeding electricity motor: 3.3W
Bottle entry plate chain electricity motor : 380V 1100W
Whole bottle motor: 380V 250W
Machine size (L*W*H): 13500*1215*2150mm
Package piece speed: 0-45package /minute
Package product size: can according to client special requirement.
Working platform height: L1150+50mm (can making according to special requirement).
Conveyor belt: shanghai
Usage film type: PE film and can use color film
PE film width PE: according to client requirement , film thickness: 0.07mm-0.13mm;
Film shrinkage ratio: length wise direction 70-80%, cross wise 20-30%.
Temperature:20-40℃.
Whole machine all set safe protection device
While package type not change, just need to change bottle height and bottle neck diameter, just need 20 minute; while not change bottle neck diameter and bottle height, just change package specification, not more than 10 minute.
Q1: Are you a trading company or a manufacturer?
A1: We have our own factory for many years, can give u best service.
Q2: What's your guarantee if we buy your machines?
A2: We offer you high-quality machines with a 1-year guarantee and free spare parts for 1 year. Meanwhile, our engineers have rich experience and have gone to more than 50 countries for installation and commissioning.
Q3: When can I get my machine after I paid?
A3: We will deliver the machines on time as the date we agreed on both sides.
Q4: How can I install my machine when it arrives?
A4: Our engineer will go to your side as soon as you get your machines ready for testing and teaching your technicians how to run the machines.
Q5: What's the delivery time?
A5: 30-45 days after the T/T deposit or L/C.
Q6: Do you provide customized service?
A6: We can design the machines according to your requirements (material, power, filling type, container and etc), at the same time we will give you professional suggestion by many years industrial experience.